On the Ponte dell’Industria, known to all as the “Iron Bridge,” the two historic ornamental arches were reinstalled on November 24, 2025, after careful restoration on the Tiber embankment: a gesture of recognition of the past that restores the bridge’s historic identity.
Techproject S.r.l., in a temporary consortium with Ingegneria del Territorio S.r.l. and Inco Engineering S.r.l., acted as Safety Coordinator during the Construction Phase on behalf of ANAS.
We are proud to have made a concrete contribution to the revitalization of an iconic infrastructure in the city, ensuring that every phase of the work was conducted according to the highest safety standards, protecting workers and the Roman community.
Sincere thanks to all the professionals involved; thanks to their commitment and dedication, this result became a reality.
